Curves

  Queen Rania St. Amman – Jordan      +962 795119496      +962 6 5333006      info@curvesjo.com

Global Certificates:

ISO 9001 : 2015

ISO 45001:2018

ISO 14001 :2015

Projects

Curves Projects

Rehabilitation of Irrigation Networks & Stations Wadi Araba

Supply of HYDROPASS           S.I.S. Smart Irrigation System

ICRC Tender - Jaber Pumping Stations Rehabilitation

Supply of EMFMs and Valves

URW-New Reclaimed water pumping station

Supply of Valves

Preparation & operation of wells in Wadi Araba

Supply of HDPE Pipes

توريد وتركيب اجهزة الري الذكية لمشاريع ري رحمة و بئر مذكور / وادي عربة

Supply of HYDROPASS           S.I.S. Smart Irrigation System

إنشاء محطات الضخ والخزان والخط الناقل لمياه الشرب في المدينة الصناعية / القويرة

Supply of Chlorination System & Control Valves

Supply and Install New Connection Pipeline from the Transmission Pipeline Zarqa Carrier 1

Supply of Ductile Pipe & Fittings

Numeira Reservoir Electro-Mechanical works Intake Station and Pipeline.

Supply of HDPE Pipes & Fittings

Scroll to Top